Annnual 5,000MT D8mm Upcasting process brass rod upward continuous casting production line
MAIN EQUIPMENT CONFIGURATION AND SUPPLY RANGE
Device name | Quantity | Remark | ||
1 | Power frequency induction furnace with core(180KW) | Two body furnace | 1 set | Furnace body, furnace body bracke |
Sensor | 1 set | Iron core, coil, water jacket, channel 1 | ||
Furnace cover | 1 set | |||
Oven building material | 1 set | Quartz sand, insulating material, refractory brick | ||
2 | Furnace electric control | Furnace electrical control | 1 set | One Electric cabinet ,one control cabinet |
Furnace temperature detection | 1 set | Display cabinet with temperature | ||
3 | Temperature measurement system | Water inlet diversion device | 1 set | Valve, pressure gauge, etc |
Mould temperature detecting assembly | 1 set | |||
Water temperature total | 1 set | |||
4 | Continuous casting machine | Top lead continuous casting machine frame | 1 set | |
AC servo motor and speed reducer | 1 set | |||
Guide wheel | 2 set | |||
Ttraction drive system | 1 set | |||
Mould hanging device | 1 set | |||
Water cooling circulating device for mould | 1 set | |||
5 | Electric control cabinet | Drive | 1 set | |
Man-machine interface | 1 set | |||
PLC controller | 1 set | |||
Lifting system | 1 set | |||
Liquid level tracking system | 1 set | |||
6 | Mould assembly | Copper rod mould | 2 set | |
Quick connector | 4 set | |||
Protection sleeve | 10 set | Ten Containing graphite mold | ||
7 | Double bar coiling machine | Cable car | 1 set | |
Receiving tray | 2 set |
Equipment Composition
Brass scraps(copper>62%) -- charging device (can match) - furnace system (melting furnace -- transition warehouse - holding furnace) - continuous casting machine crystallization moulding) -- dragger - speed device - automatic winding machine - for sale or deep processing
Brass scrap is joined in the melting furnaces through the charging device (according to the user needs), (if the raw materials is not 1# red copper, our company can design and install the reverberatory furnace before melting furnaces to remove the copper impurity). The copper plate through W-type inductor into liquid, then flow smoothly from the transition storehouse to the holding furnace, and then is in the steady reduction process through the surface covered with charcoal, at last is crystallized swiftly to the cast copper rod by the crystallizerof the upcast plant by upward copper rod process at the same time, cast copper rod is upward casted intermittently through the two traction roller. The cast copper rod through the hauling machine, and the wheelframe, the speed adjusting gear, then to the automatic winding machine to wind copper rod.
DATE OF DELIVERY
Date of Delivery: To be delivered within 60 days after the contract becomes effective.
PAYMENT ITEM
Payment term:30%T/T in advance, 70%T/T before delivery.
INSTALLATION SUPPORT
The seller will send 3 service engineers to the buyer’s factory to supervise machine installation; the buyer should pay USD100/day/person for their wage. The buyer will be responsible for travelling expenses and accommodation.
PRODUCT PICTURES
Wuxi East China Furnace Co.,Ltd
Whatsapp: 86 139 2112 5611
joey@wxhddl.cn