Upcasting process oxygen free copper rod Annnual 2,000MT D8-14.4mm upward continuous casting production line
Equipment Composition
Brass scraps(copper>62%) -- charging device (can match) - furnace system (melting furnace -- transition warehouse - holding furnace) - continuous casting machine crystallization moulding) -- dragger - speed device - automatic winding machine - for sale or deep processing
Flow Chart
Brass scrap is joined in the melting furnaces through the charging device (according to the user needs), (if the raw materials is not 1# red copper, our company can design and install the reverberatory furnace before melting furnaces to remove the copper impurity). The copper plate through W-type inductor into liquid, then flow smoothly from the transition storehouse to the holding furnace, and then is in the steady reduction process through the surface covered with charcoal, at last is crystallized swiftly to the cast copper rod by the crystallizerof the upcast plant by upward copper rod process at the same time, cast copper rod is upward casted intermittently through the two traction roller. The cast copper rod through the hauling machine, and the wheelframe, the speed adjusting gear, then to the automatic winding machine to wind copper rod.
Main Technology Parameter For Copper Rod Up-casting Machine
Annnual 2000MT D8mm-D14.4 | |
1 | Model: HDUCM-2000 |
2 | Yearly capacity:2000mt |
3 | Furnace structure: 300type two- body furnace Clmeltingfurnace and holding furnace |
4 | Casting strands:4 |
5 | Casting rod diameter : 14.4mm |
6 | casting spee:0 〜3000mn/min |
7 | annual working time:7920h |
8 | Liguidtracking precision:±2mm |
9 | Take-up coil standard: <p700mmx<pl500mnv<800mm |
10 | Copper melting velocity:260kg/h |
11 | Copper melting power consumption: <350kwh/lon |
12 | Take-up form: frequency automatic adjust |
13 | Take-up plate driven approach: PLC control, frequency adjustautomatic coiling |
14 | Material feeding methoctwhole piece of electrolytic copper cathode fed by electric hoist |
15 | Upward driven approach:dhven by the AC seivo motor transmission chain is driven by the gapless synchronous cog blet |
16 | Rod clamping methodair clamping |
17 | Operation interface : date display^seivo motor controDed by touch screen |
18 | Total power150KW AC three-phase 380V |
DATE OF DELIVERY
Date of Delivery: To be delivered within 60 days after the contract becomes effective.
PAYMENT ITEM
Payment term:30%T/T in advance, 70%T/T before delivery.
INSTALLATION SUPPORT
The seller will send 3 service engineers to the buyer’s factory to supervise machine installation; the buyer should pay USD100/day/person for their wage. The buyer will be responsible for travelling expenses and accommodation.
PRODUCT PICTURES
Wuxi East China Furnace Co.,Ltd
Whatsapp: 86 139 2112 5611
joey@wxhddl.cn